a) Always disconnect the parallel operation connection from PAT-Ts. If not, the output circuit of your PAT-Ts will be still connected to each other, so the PAT-T can’t meet the specification of its fall time.
b) Always disconnect the optional parallel operation power cables.
c) Go to CF24 (number of master-slave parallel unit setting) of the CONFIG setting to set to 1.
d) On the slave units, go to CF26 of the CONFIG setting to set to 0 (master unit or stand-alone operation).
Note: The units in the smart rack system cannot be used alone.


